VPB 33S-3R Static Concrete Placing Boom

MODEL

VPB 33S-3R

Max. Radius (m)

33

Total weight (kg)

20300

Oil tank capacity (L)

280

Length of end hose

5''× 3

Enquiry

Features & Benefits

VPB 33S-3R Static Concrete Placing Boom

The VPB 33S-3R Static Concrete Placing Boom is engineered for high-performance concrete placement in large-scale and high-rise construction projects. With four foldable boom sections and an extended 36-meter reach, it ensures accurate and efficient concrete distribution even in challenging, hard-to-access areas.

Featuring 360° slewing rotation and hydraulically operated arms, the system provides smooth, precise positioning for maximum productivity. Operated through a user-friendly control panel, it offers safe, stable, and reliable handling on site.

Built with a high-pressure hydraulic system (30–32 MPa), reinforced concrete conveying pipelines, and secure coupling mechanisms, the VPB 33S-3R is constructed from corrosion-resistant materials with heavy-duty joints to withstand continuous operation in demanding construction environments. The complete assembly includes the boom structure, mast, optimized placing radius, and a 3.4 m end hose for controlled and precise pouring.

CategorySpecificationVPB 33S-3R
PerformanceMax. Radius (m)33
Free Standing Height, Slewing Range22.7m,400°
Working temperature (°C)0~60°C
Counter weight (kg)/
Total weight (kg) (Floor frame)20300
Supply power to equipment380V/50Hz
Electric motorPower (kw)15
Hydraulic systemSystem pressure (MPa)32
Flow (L/min)18
Oil tank capacity (L)280
 Control mode(Cable+Radio) remote control
 Clearing mode for concrete pipeWater clear / Dry clear
 Section of tubular column (m×m)0.75×0.75
Arm (Booms)Boom modelfully hydraulic foldable arms
Delivery pipeline diameterDN125mm
Length of end hose5”×3
First section Length (m)14.9
First section Articulation-2.5°~82.5°
Second section Length (m)9.6
Second section Articulation0°~180°
Third section Length (m)8.5
Third section Articulation0°~180°
Fourth section Length (m)Cylinder Jack Lifting
Fourth section Articulation0.52
ClimbingClimbing ModeHole Prepared in Floor
Internal Climbing Step Distance (m)Size of Climbing Shaft : 2.0m-2.7m
Floor Frame3
Shaft Frame6
Min. Space Between Climbing (m)6
Internal Climbing Frame Placing Concrete (m)6
Rest (m)6

Contact Service

    Inquiry Form